Copergas, GDK, Brazil

The main dock, constructed of sheet piling, has a maximum depth of 9,80 metres and offers a total quay length of 1 050 metres. Installing the 4 500 tonnes of sheet piling in soil with very difficult geotechnical characteristics required a specific piling procedure to be designed in advance of the main scheme.The size chosen is L605 larssen interlock sheet piles. The sheet piles shall be installed by means of a variable frequency vibrator with an adjustable eccentric moment capable of generating a minimum centrifugal force of 3 000kN. The jetting system to consist of 4 jets of 3/4" diameter welded to each pair of sheet piles.

Project Photos

Judi Online Live Draw HK Situs Togel Terpercaya Gacor Slot Situs Judi Slot Online Terpercaya 2020 Situs Slot Gacor Slot Bonus New Member Agen Slot dan Togel Terpercaya Daftar Situs Judi Slot Online Terpercaya Bandar Togel dan Slot Judi Slot Online Jackpot Terbesar Slot Online Daftar Slot Joker Deposit Pulsa 10 Ribu Slot Gacor Slot Judi Onlain Situs Judi Onlain Togel Terpercaya Link Judi Onlain Slot Gacor Hari Ini Daftar Situs Judi Slot Online Terpercaya Judi Onlain Slot Situs Judi Online Judi Slot Online Situs Judi Slot Online EsmiSlot Bandar Judi 4D