3200 tons of GPU32. all in 18m. The existing seabed was between approximately -2.0 EL to +1.0 EL in the vicinity of the proposed wall. Subsequent filling activity has reclaimed the area to approximately +3.0 EL. Fill material is dense to very dense sandy gravel with cobbles and boulders.Installation was done by pitching the sheet piles in a piling frame and driving to refusal with an ICE 815 vibro hammer. Piles were then driven to the final required level using an IHC S90 hydraulic hammer, together with a pile helmet

Project Photos

Previous:

Next: Portsmouth docks, UK

Live Draw HK Judi Online Judi Slot Online Jackpot Terbesar Situs Judi Slot Online Terpercaya 2020 Slot Bonus New Member Situs Slot Gacor Slot Online Bandar Togel dan Slot Slot Judi Onlain Slot Gacor Link Judi Onlain Situs Judi Onlain Daftar Situs Judi Slot Online Terpercaya Gacor Slot Slot Gacor Hari Ini Togel Terpercaya Judi Onlain Slot Situs Judi Online Space Togel Judi Slot Online Bandar Judi 4D