3200 tons of GPU32. all in 18m. The existing seabed was between approximately -2.0 EL to +1.0 EL in the vicinity of the proposed wall. Subsequent filling activity has reclaimed the area to approximately +3.0 EL. Fill material is dense to very dense sandy gravel with cobbles and boulders.Installation was done by pitching the sheet piles in a piling frame and driving to refusal with an ICE 815 vibro hammer. Piles were then driven to the final required level using an IHC S90 hydraulic hammer, together with a pile helmet

Project Photos

Previous:

Next: Portsmouth docks, UK

Judi Online Live Draw HK Situs Togel Terpercaya Gacor Slot Situs Judi Slot Online Terpercaya 2020 Situs Slot Gacor Slot Bonus New Member Agen Slot dan Togel Terpercaya Daftar Situs Judi Slot Online Terpercaya Bandar Togel dan Slot Judi Slot Online Jackpot Terbesar Slot Online Daftar Slot Joker Deposit Pulsa 10 Ribu Slot Gacor Slot Judi Onlain Situs Judi Onlain Togel Terpercaya Link Judi Onlain Slot Gacor Hari Ini Daftar Situs Judi Slot Online Terpercaya Judi Onlain Slot Situs Judi Online Judi Slot Online Situs Judi Slot Online EsmiSlot Bandar Judi 4D