2100 tons of type IIIA III sheet piling,ranging in length from 5.5m to 9.5m long.All steel sheet piles were installed using a 100Te Capacity crawler crane Initially installation was carried out using a crane suspended ICE1423 vibratory piling hammer to refusal and this was then followed by impact driving using a crane suspended HPH2400 hydraulic impact hammer and a 100Te capacity mobile crane.Totally over 3000 no. sheet piles were installed during April 2010.On completion of the sheet pile installation works the Contractor completed the reinstatement of the existing soil batter profile to original levels.