Grand Steel Piling
/ Mozambique Nacala Port, Mozambique

Mozambique Nacala Port, Mozambique

2654 tons of Ø1,219mm x 32mm LSAW tubular piles in varying lengths from 13m to 20m with numerous accessories such as clutches, lifting lugs, bolt connections, hose connections, shear connections, tie rod bracket and others. Besides,we also supply 740 tons of infill sheet piles GPZ18-700 in lengths varying from 7 to 13m. This system is installed with the tubes or king piles first using a driving guide. Once the tubes are installed the guide is removed and the Z type sheet piles installed between the spaces and slotted in using the special clutches attached to the tubular piles. The project saved considerable time and money for the contractor and was a very successful first tubular combi wall application for Grand Piling.

Project Photos

Judi Online Live Draw HK Situs Togel Terpercaya Gacor Slot Situs Judi Slot Online Terpercaya 2020 Situs Slot Gacor Slot Bonus New Member Agen Slot dan Togel Terpercaya Daftar Situs Judi Slot Online Terpercaya Bandar Togel dan Slot Judi Slot Online Jackpot Terbesar Slot Online Daftar Slot Joker Deposit Pulsa 10 Ribu Slot Gacor Slot Judi Onlain Situs Judi Onlain Togel Terpercaya Link Judi Onlain Slot Gacor Hari Ini Daftar Situs Judi Slot Online Terpercaya Judi Onlain Slot Situs Judi Online Judi Slot Online Situs Judi Slot Online EsmiSlot Bandar Judi 4D