Grand Steel Piling
/ Gasoducto Andino del Sur Project, Peru

Gasoducto Andino del Sur Project, Peru

654 tons of Ø1,219mm x 32mm LSAW tubular piles in varying lengths from 13m to 20m with numerous accessories such as clutches, lifting lugs, bolt connections, hose connections, shear connections, tie rod bracket and others. 140 tons of infill sheet piles in lengths varying from 7 to 13m for the project. The unique aspects of the project were dealt with by us through constant dialogue with clients. Design evolution during the project construction required the manufacture from us to be very dynamic and able to facilitate change.

Project Photos

Judi Online Live Draw HK Situs Togel Terpercaya Gacor Slot Situs Judi Slot Online Terpercaya 2020 Situs Slot Gacor Slot Bonus New Member Agen Slot dan Togel Terpercaya Daftar Situs Judi Slot Online Terpercaya Bandar Togel dan Slot Judi Slot Online Jackpot Terbesar Slot Online Daftar Slot Joker Deposit Pulsa 10 Ribu Slot Gacor Slot Judi Onlain Situs Judi Onlain Togel Terpercaya Link Judi Onlain Slot Gacor Hari Ini Daftar Situs Judi Slot Online Terpercaya Judi Onlain Slot Situs Judi Online Judi Slot Online Situs Judi Slot Online EsmiSlot Bandar Judi 4D